Theme Park · 2013
Legoland 2013
30.05.–02.06.2013 · Legoland Deutschland, Günzburg

- Date
- 30.05.–02.06.2013
- Duration
- 4 days
- Shows
- 10
- Show no.
- 56–65
- Team
- 5
- photos
- 193
- Event no.
- 13 of 86
Earlier setup · Saberproject Surround System · Kamino weather
Unlike in previous years, this year we arrived at Legoland in Günzburg as early as Wednesday evening, so that we could set up our booth in peace instead of doing it early on Thursday as in previous years.
But since part of our team was running late, we couldn't start setting up until after midnight, and so we hauled, screwed and adjusted late into the night, until at around three o'clock our booth finally adorned the room of the Mindstorms Center in its full size and stocked with all our sabers.
Exhausted, we collapsed into our beds to get at least a few hours of sleep before the four-day event.





On Thursday we met at our booth as early as eight o'clock, because before Legoland opened its gates to visitors at 10:00, we wanted to run through our new stage program a few times on the stage of the Legoland arena.
Even though these final rehearsals are routine for us, we were particularly excited this year, because besides our new program we were also testing our brand-new, self-developed „Saberproject Surround“ wireless system, which would play the sounds of the lightsabers in real time directly through the big sound system of the Legoland arena.
Since we hadn't had a chance to test this new feature thoroughly until then, a lot of tension fell away when the familiar hum of the lightsabers came out of the speakers. In a good mood, we rehearsed our program, which we would perform three times that day.
Even though not all run-throughs went flawlessly, we returned to our booth in good spirits at half past nine, to soon welcome the first visitors and tell young and old fans about the elegant Jedi weapon.





So the morning flew by, until we finally headed to our dressing room and left our booth in the trusted hands of our helpers, without whose help we couldn't have taken part in this event, and who deserve our very special thanks at this point!
Since we shared the dressing room with the dance group Tanztreu, whom we already knew from last year, we changed in tight quarters and put on our new costumes, because this year we wanted to give our program the finishing touch not only with the Saberproject Surround System, but also with new, more authentic costumes.
When, dressed like this and armed with our sabers, we stepped into the arena, which was filled to the last seat, our initial nervousness was quickly forgotten and we fought our way motivated through the first of a total of ten performances.
After a short lunch break afterwards, we relieved our helpers at the booth, handed out FX lightsabers, talked about the different types and, in between, presented our homemade sabers in the arena at the other two shows.





That evening we went to bed early, since we were feeling the lack of sleep from the night before.
When we woke up on Friday morning, the view out the window dampened our mood. As expected, it had started raining, and unfortunately it wouldn't stop until Sunday.
Tired and a little dejected, we arrived at Legoland at around half past eight, arranged the sabers at our booth and got ready to greet the first weatherproof visitors.
Since the arena is only partly covered, the audience was smaller that day too, but that didn't make our performance any less motivated, and we earned big applause for it, even though we were freezing despite the physical exertion when we returned to our dressing room.





Glad to be back in the warm and dry, we kept the booth staffed and sent our helpers off for their lunch break. Despite the rain we looked forward to our other two shows, but were also grateful when we could finally take off our costumes for the day and spend the rest of it at the booth.
After the park closed at 19:00 and we had driven to our guesthouses, we sat together for a while, waiting for the last of our helpers, who wouldn't arrive until the night.














































































Rain · Parade · Teardown
After the rest of our helpers had also arrived on Friday night, we could finally start the next day as a complete team. Since the park would open at 10:00 as usual and we were there quite early, we still had some time for breakfast and then headed to the booth, where the R2 Builders were already assembling their droids and setting up their habitat.





When everything was cheerfully beeping away and driving around, the first visitors ventured in too. Despite the relentless rain, it filled up quite quickly, and once again we were able to answer all sorts of questions about lightsabers, give valuable tips and make new contacts.
So the morning went by fairly relaxed until it was time for our first stage show of the day. The helpers took over at the booth and we headed to the dressing room as fast as possible, to arrive there somewhat dry and change. While we slipped into our roles as Jedi and Sith once more, the dance troupe Tanztreu performed their spectacular program beforehand. Finally we stepped onto the arena stage with far less stage fright, but still a little nervous. Even though it was now quite cold and also a bit slippery, we fought our way through our choreographies.
The Saberproject Surround System in our sabers worked perfectly and created a fitting soundscape.





After our successful show, Ferenc Husta, the former bass singer of the German a cappella band Wise Guys, was waiting for us outside the backstage area. With his distinctive, unmistakable voice, he had recorded the intro to our new program for us, to get the audience excited right from the start. After lunch together with Ferenc and his family, we were already heading back to the stage, performed our second, no less successful show and afterwards could finally take off our partly rain-soaked costumes for the rest of the day.
Back at the booth, everyone could recover a little from the cold and introduce visitors to the lightsaber, until the park closed its gates and it slowly emptied. But instead of simply returning to our accommodations that evening, we drove with the members of the German Garrison to a nearby inn, to have something delicious to eat in good company, see lots of familiar faces again or go bowling.
On Sunday, the last day, we got up a bit worn out but still in good spirits. At least it had stopped raining, and everyone was confident when they arrived at the booth after a hearty breakfast. Before the park opened, we still had enough time to take a few photos or check the booth one last time. Even as the park slowly filled up, some of us didn't miss the chance to finally take a spin around Legoland and hit a few rides.





At least until it was time for the last two stage shows. Once more we gave it our all in the well-filled arena and forgot the strain of the last few days. Everything went perfectly, and we were glad to have gotten the hardest part done. Otherwise the day went very well, even though it kept drizzling now and then and the German Garrison parade would almost literally have been rained out, had a few brave stormtroopers not marched for the glory of the Empire.
Toward evening we tore down our booth, and it took quite a while until it was finally taken apart into all its pieces and packed. A little wistful that these four days had flown by, we said goodbye to each other, to the R2 Builders, the German Garrison, the helpers and the park staff, who were always working away behind the scenes everywhere to make this event possible at all.
We packed up the booth and our things and set off on the drive home, knowing full well that we wouldn't fall into our beds until very late that night. Despite the tiredness, we looked back on an unforgettable time and look forward to the next Star Wars Days at Legoland Deutschland.